Introduction

A VLOO (Very Large Ore Oil) Carrier is a combination carrier that can carry both Ore and Oil (not simultaneously in the same voyage). It is the larger version of the OBOs of yester-years where the owners would like to take advantage of the flexibility of such designs. The main factor is the presence of systems that are there in both oil tanker as well as bulk carrier.

Inspection Items

Hull Part Outfitting Part Machinery Part Electric Part Coating Part
STRUCTURE
  • Engine Room Blocks - Sub Assembly Inspections
  • Side & Bottom blocks - Sub assembly inspections
  • Block inspection
  • Pre-erection joint inspection
  • Deckhouse Block & Pre-erection Joint Inspection
  • Erection Joint Inspection
  • Deckhouse Erection Joint Inspection
ACCOMMODATION & SAFETY
  • Insulation Installation Inspection
  • Elevator Load and Handling Test
  • Cabin Final Inspection
  • Galley & Laundry Equipment Function Test
  • Safety Equipment Confirmation
MAIN ENGINE
GENERATORS
  • Main Generator & M.S.B Shop Test
  • Main Generator & M.S.B Load Test
  • Main Generator & M.S.B Blackout & Emergency Power Check
  • Main Generator & M.S.B Sequential Start
  • Emergency Generator & E.S.B Shop Test
  • Emergency Generator & E.S.B Load Test
PIPES & OUTFITTING
OTHER TESTS
  • NDE Review
  • Fillet Joint Air Test
  • Tank Air Test
  • Strength Test
  • Inclining Experiment
  • Deadweight Measurement
LEAK TEST & PIPE HYDRO TEST
  • Side Scuttle, Window Hose Test
  • Steel Door Chalk Test
  • Louver Ventilator Chalk Test
  • Hatch Cover Hose Test
  • Pipe Spool Hydro Test
  • Engine Room Pipe Installation & Hydro Test
  • Main Engine & Generator Engine F.O & D.O Service System Installation & Hydro Test
  • F.O & D.O Purifying System Installation & Hydro Test
  • Boiler F.O / D.O Line Installation & Hydro Test
  • F.O & D.O Filling & Transfer System Installation & Hydro Test
  • Ballast line - Installation & hydro test
  • Winch Hydraulic Oil System Installation & Hydro Test
  • Hatch Cover Hydraulic Line Installation & Hydro Test
  • H.F.O & L.O Heating Coil Installation & Hydro Test
  • Fire & Wash Deck Line Installation & Hydro Test
  • Bilge Line Installation & Hydro Test
  • Local Fire Fighting Line Installation & Hydro Test
  • VRC Hydraulic Main Line Installation & Hydro Test
  • Oxy-Acetylene Line Installation & Hydro Test
  • W.O Incinerator D.O System Installation & Hydro Test
OTHER PROPULSION DEVICES
  • Propeller shaft - MPI Inspection
  • Shaft Sighting After Boring Measurement
  • Stern Tube Bush Fore Fitting
  • Stern Tube Seal L.O Pipe Leak Test
  • Tail Shaft Inserting Confirmation
  • Propeller Pitch & Balance Test
  • Propeller Force Fitting
  • Shaft Clearance Measurement
  • Stern Tube Seal Centering Check
  • Shaft Wear down Measurement
  • Tail & Intermediate Shaft Alignment Measurement
  • Tail & Intermediate Shaft Coupling Bots Fitting
  • Intermediate Shaft Bearing Jack-up Test
  • Intermediate Shaft & Main Engine Coupling Alignment Measurement
  • Intermediate Shaft & Main Engine Coupling Bolts Fitting
ELECTRIC POWER
  • M.S.B.D & E.S.B.D Function Test
  • G.S.P Function Test
  • Cable Installation Inspection
BLOCKS & ERECTION STAGE
DIMENSION & SURVEY
PIPES
  • Pipe Spool Visual Inspection
  • Side Shell Penetration Pipes MPI
  • Pipe NDE
  • Cargo pipe line - Back bead inspection
  • Maine Engine L.O Service System Flushing Inspection
  • Stern Tube L.O System Flushing Inspection
  • Winch Hydraulic OIl System Flushing Inspection
  • Hatch Cover Hydraulic Line Flushing Inspection
MANEUVERING DEVICES
  • Rudder - Internal inspection
  • Rudder & Rudder Stock Contact Inspection
  • Rudder Pintle Force Fitting
  • Pintle & Neck Bush Shrinkage Fitting
  • Pintle & Neck Bearing Clearance
  • Rudder Jumping Stopper Clearance
  • Rudder - Swing test
  • Steering Gear Tiller Force Fitting
  • Rudder Carrier Chock Fast Pouring
  • Steering Gear Safety Valve Popping Test
ALARMS
  • Engineer Call & Dead-man Alarm Function Test
  • Extension Alarm Function Test
  • Emergency Stop of Fan & Oil Pump Function Test
  • CO2 Alarm Fan Trip Function Test
  • Refrigeration Chamber & Hospital Alarm Function Test
  • Steering Gear Alarm Function Test
  • Fire Alarm Control Function Test
  • Engine Room Pump Stand-by Start Stop & Alarm Function Test
  • Alarm Monitoring System Function Test
TANKS & COMPARTMENTS
  • Ballast Tanks DFT Inspection
  • Other Tanks DFT Inspection
  • Engine Room Final DFT Inspection
DEVICES
  • Loading Computer System Verification
EQUIPMENTS & SYSTEMS
  • Life Boat & Davit - Operation & Load Test
  • Rescue Boat & - Davit Operation & Load Test
  • Life Boat & Rescue Boat Equipment Confirmation
  • Accommodation Ladder Inspection
  • Accommodation Ladder - Operation & Load Test
  • Accommodation Ladder - Combination With Pilot Ladder Confirmation
  • Anchor & Cable Inspection
  • Mechanical Ventilation Fan Volume Test
  • High Velocity Pressure Vacuum (PV) Valves - Function Test
  • Hydraulic Actuator - Hydro & Function Test
  • Hatch Cover Operation Test
  • Hatch Cover Final Inspection
  • CO2 System Bottle Level Check
  • CO2 System Manifold N2 Leak test
  • CO2 System Valve Function Test
  • CO2 System Engine Room Air Blowing Inspection
OTHER EQUIPMENTS
  • Main Generator Engine Shop Test
  • Main Generator Engine Crank Chamber Cleaning
  • Main Generator Engine Crank Shaft Deflection Measurement
  • Main Generator Engine Load Test
  • Emergency Generator Engine Load Test
  • Auxiliary Boiler Hydro Test & Final Inspection
  • Auxiliary Boiler Function Test
  • Composite Boiler Hydro Test & Final Inspection
  • Composite Boiler Function Test
  • Main & Emergency Air Compressor Safety Device Test
  • Main & Emergency Air Compressor Air Charging Test
  • Oily Water Separator Function Test
  • Incinerator Function Test
  • Sewage Treatment Plant Function Test
  • Fresh Water Generator Capacity Test
  • Purifier Function Test
  • Engine Room Overhead Crane Load Test
  • Workshop Machinery Operation Test
  • Quick Closing Valve Function Test
  • Valve Remote Control System Air Blowing Test
  • Valve Remote Control System Function Test
  • Deck Stand Valve Operation Test
  • VRC Hydraulic Power Pack Function Test
  • Engine Room & Ballast Tanks Level Gauge Check
  • Bilge Suction Test
  • Engine Room Fire Damper Operation test
  • Engine Room Oil Tank Cleaning Inspection
  • Windlass Shop Test
  • Mooring winch - Load test
  • Anchor Handling Test
  • Provision Refrigeration & Air Conditioning Plant - Pressure Test
  • Provision Refrigeration & Air Conditioning Plant - Vacuum Test
  • Provision Refrigeration & Air Conditioning Plant - Function Test
  • Air Conditioning Plant - Volume Test
  • Provision Refrigeration Plant - Cooling Down Test
  • Provision Crane Shop Test
  • Provision Crane Onboard Test
  • Deck Crane Shop Test
  • Deck Crane Onboard Test
EQUIPMENTS
  • P.A & Talk Back System Function Test
  • Auto Telephone & Sound Power Telephone Function Test
  • Whistle Function Test
  • Rudder Angle Indicator Function Test
  • Navigation Lighting Function Test
  • Signal Lighting Function Test
  • Emergency Lighting Function Test
  • Day Signal Lighting Function Test
  • Echo Sounder Vacuum Test
  • Speed Log Vacuum Test
  • I.C.C.P Anode Vacuum Test
  • I.C.C.P & M.G.P.S Function Test
SEA TRIAL TEST
SEA TRIAL TEST
SEA TRIAL TEST
  • Composite Boiler Accumulation Test
  • Fire Fighting Test
  • Local Fire Fighting Function Test
  • Dead Ship Recovery Test
SEA TRIAL TEST
  • Megger Test